Republic School District

Client: Republic School District
Location: Republic, MO
Republic School District
Description:
TOTH completed several projects for the Republic School District, including a 8,800 square foot FEMA-361 safe room, a 21,000 square foot early childhood center and administration building, a 7,345 square foot elementary classroom additions, and a 17,860 square foot K-5 elementary conversion. Select services and tasks performed by TOTH, but not limited to:
- Structural design and calculations
- Prepared construction documents
- Prepared schematic design drawings and design development documents
- Assisted in preparing RFPs for geotechnical and construction services
- Materials testing and inspection
- Participated in budget and cost reviews
- Identified pre-engineered structural elements
- Advised on which structural elements required SER construction observation
- Construction administration and on-site observation