(888) 247-7577

Mid-Missouri Bank- Stormwater Detention

Civil Engineering, Stormwater Management, Projects

Client: Mid-Missouri Bank

Location: Mount Vernon, Missouri

 

Mid-Missouri Bank- Stormwater Detention

Civil Engineering, Stormwater Management, Projects

Description:
Toth is designing an underground stormwater detention facility for Mid-Missouri Bank in the City of Mount Vernon. The detention facility will be designed to limit post-project peak discharge rates to pre-project peak discharge rates at the existing 18” CMP culvert under State Highway 39 during a 25-year to 50-year storm event. The design will also include any necessary onsite stormwater collection system infrastructure that may be required to transfer stormwater from the site to the detention facility.

Contact Us

1 + 8 =

Springfield, MO Office

830 E Primrose
Suite 200
Springfield, MO 65804

Portland, OR Office

107 SE Washington St
Suite 465
Portland, OR 97214

Hermiston, OR Office

369 W Hermiston Ave

Hermiston, OR 97838