(888) 247-7577

Gravel Ridge Substation Modifications

Dec 14, 2020Projects, Electrical Engineering, Electrical Substation Design

Client: First Electric Cooperative Corporation

Location: Gravel Ridge, AR

Quick Glance: 161 kV

Gravel Ridge Substation Modifications

Projects, Electrical Engineering, Electrical Substation Design

Description:

Toth & Associates was contracted by Re-Con Company to perform engineering services for First Electric Cooperative Corporation’s Gravel Ridge Substation. The existing station was a 15/20/25 MVA – 161/12.47kV. Voltages that were installed included 161 kV high side voltage (existing), 13.2/7.62 kV low side voltage, 120/240V secondary station service, and 13.2/7.62 kV primary station service. The services accomplished include:

  • Steel structures
  • Bus work
  • Structure grounding
  • Low voltage wiring
  • Replacement of motor operator in 161 kV circuit switcher
  • Installment of battery and DC charger
  • Reclosers/Breakers
  • Relay panels
  • Removal of old control and switchgear building

Contact Us

Springfield, MO Office

830 E Primrose
Suite 200
Springfield, MO 65804

Portland, OR Office

107 SE Washington St
Suite 465
Portland, OR 97214

Hermiston, OR Office

369 W Hermiston Ave

Hermiston, OR 97838