Homestead – Oregon Trail 115kV Transmission Line

Projects, Electrical Transmission & Distribution Line Design

Description:

TOTH engineered and designed new power lines to integrate the newly built 115 kV Oregon Trail substation. The project includes approximately 4 miles of 115 kV line with 12.47 kV underbuild. Part of the project included transferring the existing facilities, 1 mile of 115 kV line and a 12.47 kV line along the entire new construction route, to the new line.

The new line is built between a road and irrigation canal. The location presented the challenge of locating the underground facilities nearby to prevent damage to underground pipes. TOTH successfully overcame this challenge by communicating with landowners and ensuring that each pole and anchor location was probed and/or vac tucked prior to digging.

Contact Toth and Associates

Springfield, MO Office

1550 E Republic Road
Springfield, MO 65804

Portland, OR Office

5331 S Macadam Ave
Suite 307
Portland, OR 97239

Billings, MT Office

2270 Grant Road
Suite 2
Billings, MT 59102

Hermiston, OR Office

369 W Hermiston Ave
Hermiston, OR 97838

Tri-Cities, WA Office

8131 W Klamath Court
Suite E
Kennewick, WA 99336

Kansas City, MO Office

1001 E 101st Terrace
Kansas City, MO 64131