Client: City of Springfield

Location: Springfield, Missouri

Project Size: 12.5 miles, 19 signalized intersections
                        Estimated $2,900,000 construction cost

 

 

City of Springfield Overlay & ADA Improvements

Civil Engineering, Projects, Transportation

Description:

The City of Springfield selected TOTH to provide engineering design, land surveying, and construction engineering services for resurfacing and the Americans with Disabilities Act (ADA) improvements for approximately 12.5 miles of primary arterials. The three corridors to receive mill and overlay for their existing pavement are National Avenue, Battlefield Road, and Sunshine Street. These three stretches of road carry 10,000’s of cars each day. In addition to the mill and overlay of these streets, the Federal funding utilized for the project requires that the intersection along the corridors be brought current with the ADA. Therefore, TOTH surveyed 19 of the signalized intersections within the project limits and designed improvements to bring the intersections into ADA compliance. TOTH has developed traffic control, restriping, milling plans, and ADA improvement plans. The estimated construction cost is $2,900,000.

Contact Us

1 + 1 =

Springfield, MO Office

830 E Primrose
Suite 200
Springfield, MO 65804

Portland, OR Office

107 SE Washington St
Suite 465
Portland, OR 97214

Hermiston, OR Office

369 W Hermiston Ave

Hermiston, OR 97838