TOTH provided structural engineering services for a new two-story, clear story in the existing court yard area.

TOTH provided structural engineering services for a new two-story, clear story in the existing court yard area.
TOTH provided structural engineering and grant writing & administration services to several new buildings on Three Rivers Community College Campus in Poplar Bluff, MO.
TOTH provided structural engineering services for the new Irving elementary school that was destroyed in a tornado in May of 2011.
Teaming with Sapp Design Associates Architects out of Springfield, TOTH provided land surveying, civil engineering, and structural engineering services for three FEMA safe room additions to schools for the Neosho R-V School District.
Since 2009, TOTH has assisted the Springfield R-XII Public School District secure over $11 million in FEMA funding to construct tornado safe rooms at four schools across the district.
Since May 2012, TOTH has assisted the City of Jackson secure more than $3.3 million dollars in FEMA funding.
The City of Buffalo, Missouri secured TOTH’s services to design sidewalk improvements along Main Street from US Highway 65 to Hickory Street in Buffalo, Missouri.
The Carl Junction R-1 School District passed a $16.5 million bond issue in 2014 for the expansion of new safe room facilities at their existing high school, intermediate school, and K-1 buildings.
The City of Buffalo, Missouri secured TOTH’s services to complete a study of its entire potable water system.
TOTH is currently designing a non-transient, non-community well for the Hollister R-V School District’s new Agricultural Facility.
TOTH completed design and construction administration for the Taney County Regional Sewer District of the National Enzyme Company Area Wastewater Improvements.
Webb City voters approved a $9 million bond to supplement a $7.2 million in grant funding and $1.2 million from the district’s capital improvements fund to construct additions to seven existing schools.
The City of Rockaway Beach, Missouri operates a 600,000 GPD regional wastewater treatment facility serving four separate entities.
Teamed with Hoener Architects out of St. Louis, TOTH provided land surveying, civil engineering and structural engineering services for $28 million of projects across the Farmington School District in Farmington, Missouri.
TOTH designed a single span, 46-foot long steel I-girder or concrete slab beam over Wilson Creek on County Road 146 in Greene County, Missouri.
Payne Switch Station is a new 138 kV four-terminal switch station constructed to support Western Farmers Electric Cooperative’s (WFEC) transmission system in Oklahoma.
TOTH developed a ten year system study, detailing proposed short-term recommendations for the electric system.
In 2001, Toth provided direct testimony and a cost of service study on behalf of Arkansas Valley Electric Cooperative Corporation (AVECC) for an act 821 and U-2811 filing.
TOTH assisted the City of Ozark, Missouri in the GPS data collection and GIS system development of their city-wide stormwater system.
TOTH assisted the Pemiscot-Dunklin Electric Cooperative in the GPS data collection and GIS data development for their underground and overhead electric utility systems.