Umatilla Electric Cooperative – Construction Work Plan
Client: Umatilla Electric Cooperative
Location: Hermiston, Oregon
Umatilla Electric Cooperative – Construction Work Plan
Description:
This project consists of construction of a new 161 kV transmission line that is 7.5 miles long and consists primarily of steel H-frame structures. The line runs between the existing Three Brothers station and the newly built Clarkridge station.
For approximately 2 miles, the line runs adjacent to an existing 69 kV line. The line also crosses multiple distribution lines, roads, and underground facilities.
Right-of-Way
- Define Centerline
- Manage Survey
- Easement Negotiation and Procurement
- BMP Plan
Design
- Create Plan and Profile
- Bill of Materials
- Specify and Procure Steel Poles
- Staking
- Assembly Drawings
Contract:
Contract Administration for Line Construction
Observation of Construction