Neosho R-V School District

NEOSHO R-V SCHOOL DISTRICT

Owner: Neosho R-V School District

Location: Neosho, Missouri

Teaming with Sapp Design Associates Architects out of Springfield, TOTH provided land surveying, civil engineering, and structural engineering services for three FEMA safe room additions to schools for the Neosho R-V School District. TOTH’s responsibilities included structural building design, stormwater collection and conveyance, site grading, site utilities, and parking lot and access road design. We also provided topographic surveys of three sites:, the high school, South Elementary and George Washington Carver Elementary;

TOTH wrote and administered approximately $5.2 million in FEMA grants to fund the three additions, which totaled over 31,000 square feet.